Location: Saue
Installation Time: July 2024
Installed Solution: In the first phase, a Deye inverter with 2×50 kW capacity and 400 kWh storage was installed. In the second phase, an additional 350 kW capacity and 1.4 MWh storage will be installed. The storage solutions are managed by Soleron EMS software.
Location: Tallinn
Installation Time: April 2024
Installed Solution: Megarevo R10KH3 10 kW inverter and Letopa 10.24 kWh batteries, managed by Soleron EMS software.
Location: Tallinn
Installation Time: December 2023
Installed Solution: Megarevo 500kW/560 kWh storage solution, managed by Soleron EMS software.
Kasutame küpsiseid, et aidata teil tõhusalt navigeerida ja teatud funktsioone täita. Üksikasjalikku teavet kõigi küpsiste kohta leiate allpool iga nõusolekukategooria alt. Küpsised, mis on liigitatud kui "Vajalikud", salvestatakse teie brauserisse, kuna need on olulised saidi põhifunktsioonide võimaldamiseks.